Three Season & Screen Enclosure - Smoking Shelters. CSI 3-Part Specifications.
THREE SEASON & SCREEN ENCLOSURE 13120
- SMOKING SHELTERS 13120
Numbers shown on specifications are current CSI Masterformat
PART 1 GENERAL
1.01 WORK INCLUDES
A. Furnish prefabricated, pre-engineered aluminum glazed structure (Three Season Enclosure
or optional Screen Room).
1.02 REFERENCES
A. Conform with the following codes, specifications and standards. (where applicable)
1. Architectural Aluminum Manufacturers Association (AAMA)
2. Flat Glass Marketing Association (FGMA)
3. American National Standards Institute (ANSI)
4. Insulating Glass Certification Council (IGCC)
5. International Conference of Building Officials (ICBO)
6. Building Officials & Code Administrators (BOCA)
7. Southern Building Code Congress International (SBCCI)
8. Aluminum Association
1.03 PERFORMANCE REQUIREMENTS
A. Air Infiltration - Complies with testing per ASTM-E283.
B. Static water resistance - Complies with testing per ASTM-E331.
C. Dynamic water resistance - Complies with testing per AAMA-501.1.
D. Wind loading - Withstands wind loads based on ANSI-A58.1/ASCE-7 guidelines.
E. Live/snow loading - Withstands vertical roof loads based on the greater of 20
psf live load or roof snow loads based on ICBO/BOCA/SBCCI guidelines.
1.04 SUBMITTALS
A. Shop Drawings.
Submit for Architects review and approval prior to fabrication, including pertinent
details for installation, anchorage of framing members, glazing, sealing, flashing and
adaptation of systems to specific project.
B. Engineering Calculations.
Submit engineering calculations to the Architect, stamped and certified by a Registered
Professional Engineer attesting adequacy of system to meet required loads.
1.05 SAMPLES
A. Submit corner sample to represent minimum quality of work.
B. Submit 12" long glazing bar to represent color of aluminum finish.
1.06 DELIVERY, STORAGE AND HANDLING
A. Deliver materials to jobsite in manufacturer's packaging.
B. Store off ground in a dry covered area, protected from weather conditions.
1.07 WARRANTY
A. Provide complete manufacturers warranty; 5 years on defects of materials and 1
year on labor.
PART 2 PRODUCTS
2.01 ACCEPTABLE MANUFACTURERS
A. Patio Enclosures, Inc., Macedonia, Ohio. 1-800-468-0720 Ext. 350.
2.02 MATERIALS - THREE SEASON (Optional Screen Room).
A. STRUCTURE Note: Optional Screen Room use #1,3,4,5 only.
1. Master frame shall be 3 1/16" deep.
2. Full units shall be comprised of one movable glass panel, one fixed glass panel and one
movable screen panel.
3. Structural sections: Shall be extruded aluminum 6063 alloy.
4. Screen panel frame shall be 3/4" thick and mounted in a separate non-slip track.
Screen cloth shall be black painted aluminum.
5. Moving screen panels shall have two fixed nylon wheels.
6. Moving glass panels shall have two adjustable steel wheels surrounded by a nylon tire,
fixed glass panels shall have two fixed nylon wheels.
7. Window and door units shall be custom manufactured to order.
8. Options to adjust height shall include glass kneewall or glass transom.
B. WEATHER SEAL
1. Polypropylene woven pile.
C. FASTENERS
1. A list of fasteners and related components shall be provided upon request of the
Architect from Patio Enclosures, Inc.
D. SILICONE SEALANT
1. Silicone shall meet or exceed federal specifications TT-S-001543A.
2. Sealants shall match color of adhering surfaces, as approved by the Architect.
E. GLAZING
1. Window and door units shall be 1/8" or 5/32" tempered glass, depending on
size.
2. Vertical glass shall be single glazed clear.
3. Optional Glass: Low-E, Bronze Tint, Azurelite or as selected by designer.
F. OPTIONAL WIRING RACEWAY
1. To be used for current or future wiring requirements.
2.04 FINISH
A. All visible aluminum extrusions shall be maintenance free, exterior grade PPG
Duracron/Polycron paint finish.
B. Paint finished shall be electrostatically applied, and baked.
C. Color: Quaker Bronze, Brown, Beige or White.
* Optional Foam Roof System. (Manufactured by P.E.I.)
a. Panels shall be 3" or 6" overall and consist of expanded high density
polystyrene (EPS) insulation sandwiched between 2 sheets of .023" aluminum.
b. Paint for the aluminum sheets shall be an electrostatically applied, baked enamel
finish, with an additional Krystal Kote to provide increased durability and
efficient water run-off.
c. Color: white/white, beige/beige or beige/white.
d. Flush-mount skylights using temp/temp. IGU shall be available option.
e. Minimum pitch shall be 1/2" per foot.
f. Panels shall be 36" wide connected by a structural I-Beam, containing thermal
break.
g. Roof deflection of Roof System under design load shall not exceed 1/120 of its clear
span.
h. Engineering calculations shall be available at the Architect's request from PEI
(stamped & certified by a Registered Professional Engineer).
i. Roof system shall have passed a full scale fire test by a testing laboratory accredited
by all major model code groups.
PART 3 EXECUTION
3.01 INSPECTION
A. Solarium contractors shall examine surrounding structure and the conditions under which
the work is to be performed, and notify the General Contractor and Architect in writing of
any conditions detrimental to the proper and timely completion of job. Solarium erection
shall not proceed until any and all unsatisfactory conditions have been corrected in an
acceptable manner to the solarium contractor.
B. Surrounding and attaching structures. (basewall, building wall, etc.) shall be plumb,
level and square, plus or minus 1/4".
3.02 INSTALLATION
A. Shall be in accordance with manufacturer's installation instructions.
3.03 FINAL CLEANING
A. After each work day, leave immediate area neat.
B. Remove excess sealant compounds from aluminum and glass surfaces promptly after
completion.