ÃÛÌÒÓ°Ïñ

architecture - engineering - construction
ÃÛÌÒÓ°Ïñ

New Project From Elite Crete: Pizza Restaurant Courtyard

 

The courtyard at this pizza restaurant was in poor shape. The concrete was pitted, stained and otherwise needed taken out and replaced. With THIN-FINISH however a durable, permanent and decorative finish was made possible in just a few days and at a fraction of the cost of replacement.

For other relevant searches, you might want to try:

(02 - 16 Div.) Site Construction
(03 - 16 Div.) Concrete
(03300) Cast-in-Place Concrete
(03330) Architectural Concrete
(03350) Concrete Finishing
(03360) Concrete Finishes
(03390) Concrete Curing
(03900) Concrete Restoration and Cleaning
(03910) Concrete Cleaning
(03920) Concrete Resurfacing
(03930) Concrete Rehabilitation
(09600) Flooring
(09610) Floor Treatment
(09620) Specialty Flooring
(03) Concrete
  (03 01 00) Maintenance of Concrete
(03 01 30) Maintenance of Cast-in-Place Concrete
(03 30 00) Cast-in-Place Concrete
(03 33 00) Architectural Concrete
(03 35 00) Concrete Finishing
(03 35 19) Colored Concrete Finishing
(03 35 23) Exposed Aggregate Concrete Finishing
(03 35 26) Grooved Concrete Surface Finishing
(03 39 00) Concrete Curing
(09 60 00) Flooring
(09 61 00) Flooring Treatment
(09 62 00) Specialty Flooring
(32) Exterior Improvements
(45 37 00) Primary Metal Manufacturing Equipment