Ӱ

architecture - engineering - construction
Ӱ

Ruskin COVID-19 Response Case Studies

 

Life Safety for COVID-19 Treatment Center in Chicago, IL

Ruskin® Rep Air Products Equipment ordered six model DIBD20 UL555 classified dynamic curtain fire dampers. These dampers were vital for life safety within a COVID-19 treatment center in Chicago. The order was placed at 4:00 pm and our Lexington plant shipped the next morning!

Urgent Hospital Expansion in Jacksonville, FL

Ruskin® Rep Tom Barrow Co. were working on an urgent hospital expansion project in Jacksonville, FL needing combination fire and smoke dampers for life safety! They ordered nine dampers at 9:00 am on April 9th and Ruskin® shipped the dampers that afternoon on air freight to be installed on April 10th! The dampers were Ruskin® model FSD60 and included 24-volt actuators, 20” long sleeves, position indication switches, and 1-sided FAST mounting angles, and six of the dampers were large, multi-section assemblies!

Monitoring Pressurized Rooms in Rural Colorado

Ruskin® Rep Long Building Technologies needed airflow measurement for a COVID-19 hospital expansion project in Colorado. Two TPD05K airflow probes and four AMP002 airflow probes were ordered on April 7th and shipped April 10th. These products are a key piece in monitoring pressurized rooms used amidst the COVID-19 crisis.

Containment Needed in Laboratory in Baton Rouge, LA

Ruskin® Rep CIS needed to support new laboratories in Louisiana. Bubbletight dampers were needed to provide containment for new testing areas as part of their expansion. Six model BTO82 industrial bubbletight dampers were expedited by Ruskin’s Geneva plant for delivery required by April 9th.

Temporary COVID-19 Hospital Required Volume Control in Providence, RI

Ruskin® Rep Air Distribution Corp. were working on a temporary COVID-19 Hospital in Rhode Island, where a CDR25 commercial volume control damper was needed fast. Ruskin® took the order late in the day on April 14th and shipped it the next morning of April 15th!

At Ruskin®, we take performance seriously, especially when our customers need rapid delivery of high-quality dampers and louvers. When we commit to shipping your order on a Same Day, Next Day, 72 Hour, 5-Day, 7-day or 10-Day program, it’s guaranteed!

Please contact your local representative!

@ruskincompany #ruskincompany #AMCA #HVAC

For other relevant searches, you might want to try:

(01 86 19) HVAC Performance Requirements
(01 89 23) Site HVAC Utilities Performance Requirements
(23) Heating, Ventilating, and Air Conditioning (HVAC)
(23 01 00) Operation and Maintenance of HVAC Systems
(23 01 20) Operation and Maintenance of HVAC Piping and Pumps
(23 01 30) Operation and Maintenance of HVAC Air Distribution
(23 01 30.51) HVAC Air-Distribution System Cleaning
(23 01 70) Operation and Maintenance of Central HVAC Equipment
(23 01 80) Operation and Maintenance of Decentralized HVAC Equipment
(23 01 90) Diagnostic Systems for HVAC
(23 05 00) Common Work Results for HVAC
(23 05 13) Common Motor Requirements for HVAC Equipment
(23 05 16) Expansion Fittings and Loops for HVAC Piping
(23 05 19) Meters and Gages for HVAC Piping
(23 05 23) General-Duty Valves for HVAC Piping
(23 05 29) Hangers and Supports for HVAC Piping and Equipment
(23 05 33) Heat Tracing for HVAC Piping
(23 05 48) Vibration and Seismic Controls for HVAC
(23 05 53) Identification for HVAC Piping and Equipment
(23 05 63) Anti-Microbial Coatings for HVAC Ducts and Equipment
(23 05 66) Anti-Microbial Ultraviolet Emitters for HVAC Ducts and Equipment
(23 05 93) Testing, Adjusting, and Balancing for HVAC
(23 06 00) Schedules for HVAC
(23 06 20) Schedules for HVAC Piping and Pumps
(23 06 30) Schedules for HVAC Air Distribution
(23 06 30.13) HVAC Fan Schedule
(23 06 30.23) HVAC Air Cleaning Device Schedule
(23 06 70) Schedules for Central HVAC Equipment
(23 06 70.16) Packaged Outdoor HVAC Equipment Schedule
(23 06 80) Schedules for Decentralized HVAC Equipment
(23 06 80.13) Decentralized Unitary HVAC Equipment Schedule
(23 07 00) HVAC Insulation
(23 07 16) HVAC Equipment Insulation
(23 07 19) HVAC Piping Insulation
(23 08 00) Commissioning of HVAC
(23 09 00) Instrumentation and Control for HVAC
(23 09 13) Instrumentation and Control Devices for HVAC
(23 09 23) Direct-Digital Control System for HVAC
(23 09 33) Electric and Electronic Control System for HVAC
(23 09 43) Pneumatic Control System for HVAC
(23 09 53) Pneumatic and Electric Control System for HVAC
(23 09 93) Sequence of Operations for HVAC Controls
(23 20 00) HVAC Piping and Pumps
(23 25 00) HVAC Water Treatment
(23 30 00) HVAC Air Distribution
(23 31 00) HVAC Ducts and Casings
(23 31 19) HVAC Casings
(23 32 00) Air Plenums and Chases
(23 34 00) HVAC Fans
(23 34 13) Axial HVAC Fans
(23 34 16) Centrifugal HVAC Fans
(23 34 23) HVAC Power Ventilators
(23 37 23) HVAC Gravity Ventilators
(23 37 23.13) HVAC Gravity Dome Ventilators
(23 37 23.16) HVAC Gravity Louvered-Penthouse Ventilators
(23 37 23.19) HVAC Gravity Upblast Ventilators
(23 38 00) Ventilation Hoods
(23 40 00) HVAC Air Cleaning Devices
(23 57 00) Heat Exchangers for HVAC
(23 70 00) Central HVAC Equipment
(23 74 00) Packaged Outdoor HVAC Equipment
(23 75 00) Custom-Packaged Outdoor HVAC Equipment
(23 80 00) Decentralized HVAC Equipment
(23 81 00) Decentralized Unitary HVAC Equipment
(25 35 00) Integrated Automation Instrumentation and Terminal Devices for HVAC
(25 55 00) Integrated Automation Control of HVAC
(25 95 00) Integrated Automation Control Sequences for HVAC