architecture - engineering - construction
Tricon Poly
Other News Subscribe to FREE newsletter | Jan 04, 2017 |
Overview
APPLICATION: Chilled Water, Condenser Water, Potable Water, Waste Water, Process PipingSERVICE PIPE: DR-11 HDPE
INSULATION: Polyurethane Form
JACKETING: HDPE / PVC / FRP / Galvanized / Stainless Steel / Aluminum
TEMP: Up to 75掳F / 24掳C
NOM. LENGTH: 20 Ft. - 40 Ft.
System Specifications
Service Pipe:All service pipes shall be High Density Polyethylene (HDPE) with the properties as listed below. Pipe and fittings are manufactured from polyethylene and fabricated to Standard Dimension Ratio (SDR) wall thickness.
HDPE carrier pipe materials & properties:
- Std. Spec. for Polyethylene Plastic Pipe (SDR-PR) based on OD. ASTM F-714
- Resin Type III, Grade P34, Cat. 5, CL C ASTM D-3350
- Long Term Hydrostatic Strength 1600 psi ASTM D-2837
- Std. PE for Water Distribution 4鈥-63鈥 AWWA C-906
The insulation shall be a foamed in place closed cell polyurethane which completely fills the annular space between the carrier pipe and the exterior casing. The insulation shall have the following physical properties:
- Minimum Density (lb./cu. ft.) 2.0 ASTM D-1621
- 90-95 % Closed Cell ASTM D-2856
- 鈥淜鈥 Factor BTU/Hr. sq. ft. 掳F/in. . . .147 ASTM C-177
- Maximum operating temperature shall not exceed 75掳 F.
The casing shall be High Density Polyethylene (HDPE) with the following properties:
- ASTM D-3350鈥esin Type III, Grade P34
- ASTM D-638鈥ltimate Elongation 850%
- ASTM D-638鈥ensile Yield Strength 3300 psi
- ASTM D-790鈥angent Flexural Modules 175,000 psi
All fittings shall be HDPE, factory insulated and fusion welded to the HDPE service pipe and sealed to the outer jacket. Field installed fittings are insulated and sealed with Tricon supplied insulation kits.
Field Joints:
After thermal butt fusion welding and hydrostatic testing of the carrier pipe, HDPE jacketed straight field joints shall be insulated with polyurethane foam half-shells to the thickness specified, and sealed water-tight with a heat-shrink sleeve.
Installation:
No Piping shall be installed in standing water. Trenches shall be maintained dry until final field closure is complete. The installing contractor shall handle the piping system in accordance with the directions furnished by the manufacturer and as approved by the architect and engineer. The carrier piping shall be hydrostatically tested to 1-1/2 times the operating pressure, or as specified in the contract documents. The test shall be maintained for a minimum time of 1 hour. EXERCISE DUE CARE WHEN INSTALLING AND TESTING THE PIPING SYSTEM.
Backfill:
A 4-inch layer of sand or fine gravel, less than 陆鈥 in diameter, shall be placed and tamped in the trench to provide uniform bedding for the HDPE system. Once the system is in place, the trenches shall be carefully backfilled with similar material and hand tamped in 6鈥 layers until a minimum of 12鈥 above the top of the preinsulated pipe has been achieved. The remainder of the backfill shall be void of rocks, frozen earth and foreign material. The trench shall be compacted to comply with H-20 Highway loading.
System Options:
- Optional HDPE casings include DR 32.5
- Optional metal casings include Galvanized, Aluminum or Stainless Steel.
- Heat Tracing
About Tricon Piping Systems
Tricon Piping Systems, Inc. is a leading manufacturer of prefabricated, preinsulated, secondary containment, and conduit piping systems for industrial and commercial applications.
Other services and products available:
- Electric or Steam Heat Trace
- Leak Detection
- Cathodic Protection
- Computer Aided Engineering Drawings
For other relevant searches, you might want to try: