Tricon Ductile Iron Pipe
Other News Subscribe to FREE newsletter | Jun 30, 2020 |
APPLICATION:
Chilled Water, Heating Hot Water, Potable Water, Waste Water
SERVICE PIPE:
Ductile Iron (Push Joint, Mechanical Joint, Flanged)
INSULATION:
Polyurethane Foam
TEMP:
Up to 225掳F (107掳C)
NOM LENGTH:
18 Ft. - 20 Ft.
Service Pipe:
The service pipe shall be Ductile Iron manufactured in accordance with ANSI/AWWA C151/A21-51. Push-on joints and mechanical joints shall be in accordance with ANSI/AWWA C111/A21.11
Insulation:
The insulation shall be a foamed in place closed cell polyurethane which completely fills the annular space between the carrier pipe and the exterior casing. The insulation shall have the following physical properties:
- Minimum Density (lb./cu. ft.) 2.1 ASTM D-1622
- 鈥淜鈥 Factor BTU/Hr. sq. ft. 掳F/in. .147 ASTM C-518
- 90-95 % Closed Cell ASTM D-2856
The exterior casing shall be:
(1) Seamless, extruded white PVC Type 1, Grade 1, Class 12454-B per ASTM D-1784 or
(2) Seamless, High Density Polyethylene (H.D.P.E.) ASTM D-1248 with the following physical properties:
- ASTM D-638鈥ltimate Elongation 850%
- ASTM D-638鈥ensile Yield Strength 3300 psi
- ASTM D-3350鈥esin Type III, Grade P34
- ASTM D-790鈥angent Flexural Modules 175,000 psi
Fittings:
All fittings shall be mechanical joint and restrained with a mechanical retainer gland or a concrete poured thrust block. Fittings shall be in accordance with AWWA C110 and AWWA C111.
Field Joints:
If required, all straight joints with an HDPE jacket shall be covered with a wrap of Polyken Tape and covered with a HDPE rockshield. PVC jackets shall be covered with a PVC sleeve and a wrap of Polyken Tape.
Installation:
No Piping shall be installed in standing water. Trenches shall be maintained dry until final field closure is complete. The installing contractor shall handle the piping system in accordance with the directions furnished by the manufacturer and as approved by the architect and engineer. The service piping shall be hydrostatically tested to 1-1/2 times the operating pressure, or as specified in the contract documents. The test shall be maintained for a minimum time of 1 hour. EXERCISE DUE CARE WHEN INSTALLING AND TESTING THE PIPING SYSTEM.
Backfill:
A 4-inch layer of sand or fine gravel shall be placed and tamped in the trench to provide stable and uniform bedding for the piping system. Once the system is in place, the trenches shall be carefully backfilled and hand tamped in 6鈥 layers until a cover of at least 24鈥 from the top of the pipe has been achieved. The first 12鈥 of backfill shall be sand or fine gravel less than 陆鈥 in diameter. The remainder of the backfill shall be void of rocks, frozen earth and foreign material over 6鈥 in diameter. The trench shall be compacted to comply with H-20 Highway loading.
Accessories:
Heat Tracing
#Tricon #Piping #Prefabricated #Preinsulated #Heating #Cooling #Containment
For other relevant searches, you might want to try: